Contract 74313 REL 90: 1993-066-00 EXP OREGON FISH SCREENS PROJECT
Project Number:
Title:
Oregon Fish Screens Project
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
74313 REL 90
Contract Title:
1993-066-00 EXP OREGON FISH SCREENS PROJECT
Contract Continuation:
Previous: Next:
74313 REL 68: 1993-066-00 EXP OREGON FISH SCREENS PROJECTS
  • 74313 REL 108: 1993-066-00 EXP OREGON FISH SCREENS PROJECTS - IMPLEMENTATION
Contract Status:
Closed
Contract Description:
The project improves survival of native fish species through the implementation of fish screen, passage, and habitat projects (irrigation diversions, dams, culverts, habitat structures, etc.) on both public and private land.  Along with funds from BPA, the program uses cost share from PCSRF, OWEB, Oregon General Fund, and ODFW Surcharge funds for implementation.  The project also partners with local and regional cooperators (USFS, SWCD's, etc.) and may receive some funding from those partnerships to implement mutual, high priority projects.  

The project is housed at the John Day Screen Shop in John Day, Oregon, but supports projects in most of Eastern Oregon.  Prioritization of projects is primarily focused by the Mid-Columbia Steelhead Plan, but Oregon Sub-basin plans and other regional plans help determine best use of money on the ground, while maximizing partnership projects throughout the entire area.        

The project will solicit a subcontractor to complete cultural resource surveys on ground disturbance projects (through the supplemental Cultural Expense Contract).  Once the subcontractor has completed all surveys for the contract year, the report will be reviewed by ODFW and then submitted to BPA for final compliance review and approval.  Work on ground disturbance projects will not begin until BPA has provided approval.  
Account Type(s):
Expense
Contract Start Date:
01/01/2021
Contract End Date:
12/31/2021
Current Contract Value:
$1,272,022
Expenditures:
$1,272,022

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Routine Administration of BPA Contract 12/31/2021 12/15/2021
Complete Environmental Clearance Documentation or Prepare Biological Assessment B: 165. Complete Environmental Clearance Documentation 12/31/2021 12/16/2021
New projects identified for future funding and added to prioritized list of potential projects. C: 114. Identify and prioritize new projects for future funding. 12/31/2021 12/15/2021
Designs and specifications for planned projects. D: 175. Produce designs for specific projects. 12/31/2021 12/15/2021
Culvert Removed and replaced with a culvert arch on Tinker Creek. G: 184. Replace Culvert on Tinker Creek (Rd 3620) 12/31/2021 08/31/2021
Existing culverts and roadbed removed on Tinker Creek. H: 184. Remove Culverts on Tinker Creek 12/31/2021 08/31/2021
Projects installed. N: 208. Indian Creek (Winegar) Project 12/31/2021 06/30/2021
Projects installed. O: 208. Indian Creek (Holliday) Project 12/31/2021 06/30/2021
Projects installed. P: 208. Fox Creek (McGirr) Project 12/31/2021 12/15/2021
Project installed. V: 208. John Day River (Ricco) #24 Screen Project 12/31/2021 12/15/2021
Project installed. W: 208. John Day River (Ricco) #26 Screen Project 12/31/2021 06/30/2021
Projects installed. X: 208. Flat Creek Project 12/31/2021 09/30/2021
Pump fish screens and water measuring devices installed AD: 208. Install Pump Fish Screens the Lower Mainstem John Day River Basin (downstream of the North Fork confluence). 12/31/2021 12/16/2021
Pump fish screens and water measuring devices installed AE: 208. Install Pump Fish Screens in the North Fork John Day River Drainage. 12/31/2021 12/16/2021
Pump fish screens and water measuring devices installed AF: 208. Install Pump Fish Screens in the South Fork of the John Day River Basin. 12/31/2021 12/16/2021
Pump fish screens and water measuring devices installed AG: 208. Install Pump Fish Screens in the Upper Mainstem John Day River Basin. 12/31/2021 12/16/2021
Pump fish screens and water measuring devices installed AH: 208. Install Pump Fish Screens in the Umatilla River Basin. 12/31/2021 12/16/2021
Large wood placed on Tinker Creek. AL: 29. Improve instream habitat on Tinker Creek 12/31/2021 08/31/2021
Projects Installed (No ground disturbance). AR: 186. Screen Component Replacement on oldest Screens; Install water control devices (Upper John Day) 12/31/2021 12/16/2021
Projects installed (no ground disturbance). AS: 186. Screen Component Replacement on oldest Screens; Install water control devices (Umatilla River) 12/31/2021 12/16/2021
Completed Annual Report AU: 132. Submit Progress Report for the period 1/1/2020 - 12/31/2020 07/26/2021 07/26/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 6 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 5 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 5 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 25 instances of WE 208 Irrigation Infrastructure Construction or Replacement

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Routine Administration of BPA Contract
B 165 Complete Environmental Clearance Documentation
C 114 Identify and prioritize new projects for future funding.
D 175 Produce designs for specific projects.
E 184 Remove Culvert on Junkens Creek and install ATV bridge.
F 184 Replace Culvert on Pine Hollow.
G 184 Replace Culvert on Tinker Creek (Rd 3620) 06/28/2021
H 184 Remove Culverts on Tinker Creek 06/28/2021
I 184 Replace Culvert on East Fork Beech Creek (Rd 3600-052)
J 208 Install Fish Exclusion Barriers on the Enterprise Ditch on the John Day River.
K 208 Install Fish Exclusion Barriers on the Enterprise Ditch on the John Day River.
L 208 Pine Creek (Anderson) Project
M 208 Bridge Creek (Middle Fork John Day River) Project
N 208 Indian Creek (Winegar) Project 03/15/2021
O 208 Indian Creek (Holliday) Project 03/15/2021
P 208 Fox Creek (McGirr) Project 07/01/2021
Q 208 Wiwaanyatt Creek (Middle Fork John Day River) Project
R 208 Wiwaanyatt Creek (Middle Fork John Day River) Project
S 208 John Day River (Voigt) #11 Screen Project
T 208 John Day River (Voigt) #12 Screen Project
U 208 John Day River (Voigt) #15 Screen Project
V 208 John Day River (Ricco) #24 Screen Project 03/15/2021
W 208 John Day River (Ricco) #26 Screen Project 03/15/2021
X 208 Flat Creek Project 03/15/2021
Y 208 Bear Creek Project
Z 208 Johnson Creek Project
AA 208 Beech Creek Project
AB 208 John Day River #59 Headgate Project
AC 208 Install Pump Fish Screens in the Middle Fork of the John Day River Basin. 03/20/2020
AD 208 Install Pump Fish Screens the Lower Mainstem John Day River Basin (downstream of the North Fork confluence). 02/10/2021
AE 208 Install Pump Fish Screens in the North Fork John Day River Drainage. 03/20/2020
AF 208 Install Pump Fish Screens in the South Fork of the John Day River Basin. 02/10/2021
AG 208 Install Pump Fish Screens in the Upper Mainstem John Day River Basin. 02/10/2021
AH 208 Install Pump Fish Screens in the Umatilla River Basin. 03/20/2020
AI 29 Improve instream habitat on Junkens Creek
AJ 29 Improve instream habitat in Pine Hollow
AK 29 Improve instream habitat on Murderers Creek
AL 29 Improve instream habitat on Tinker Creek 06/28/2021
AM 29 Improve instream habitat on East Fork Beech Creek
AN 186 Screen Component Replacement on oldest Screens; Install water control devices (Lower John Day) 02/10/2021
AO 186 Screen Component Replacement on oldest Screens; Install water control devices (South Fork John Day) 02/10/2021
AP 186 Screen Component Replacement on oldest Screens; Install water control devices (Middle Fork John Day) 02/10/2021
AQ 186 Screen Component Replacement on oldest Screens; Install water control devices (North Fork John Day) 02/10/2021
AR 186 Screen Component Replacement on oldest Screens; Install water control devices (Upper John Day) 02/10/2021
AS 186 Screen Component Replacement on oldest Screens; Install water control devices (Umatilla River) 02/10/2021
AT 185 Periodic Status Reports for BPA
AU 132 Submit Progress Report for the period 1/1/2020 - 12/31/2020